Starting the project, digging the common firing line to lay in the gravel base.

 

50 yard berm almost completed.

 

First layer of gravel installed for the common firing line.

 

Standing on the top of the 50 yard berm looking at the common firing line.

 

Cutting and compacting the area for the 8′ berm behind the common firing line after the top soil was removed.

 

Completed block wall behind the common firing line.

 

Setting the block for the north wall of the 25′ pistol bay.

 

Completed 50 yard berm.

 

Another angle of the north wall of the pistol bay.